17 Jan
January 17, 2022 10:44 amOn the 17th of January, a low loader will be arriving to site via Blythe Road at 6:30am, this is required to arrive at this time due to vehicle size and movement orders. This will be delivering the sheet piling rig ready for commencement of Central core works. The rig will be tracked off the low loader and parked up until works start at 8am.
Categorised in: Archives
This post was written by Victoria
Comments are closed here.